Why do I need dynamic load management and what role does the simultaneity factor play?
Without regulating the energy via load management, a simultaneity factor of 1 must be assumed for the grid dimensioning. This means that it must be assumed that all charging stations in simultaneous operation draw their full power at the same time. By using load management, a larger number of charging solutions can be operated according to the available energy at the house connection than without load management, as these can be regulated by the load management if required. This prevents the connection from being overloaded.





